Resumé
Dette bachelorprojekt undersøger problemer, der opstår, når en ældre produktionsbygning ændrer anvendelse og varmesystemet tilpasses nye behov. Udgangspunktet er en tidligere telefonfabrik, som er omdannet til lejemål med forskellig brug. Den centrale problemstilling er, hvordan retrofittede komponenter i varmecentralen – pladevarmeveksler, cirkulationspumper og reguleringsventiler – kan analyseres og optimeres, så dimensionering, drift og energiforbrug passer til den nye anvendelse. Metodisk beregnes bygningens dimensionsgivende varmetab efter dansk standard (DS418), og potentielle svagheder i klimaskærm og ventilation identificeres. Komponenternes kapacitet og drift vurderes gennem teoretiske beregninger og feltmålinger med hydrauliske instrumenter, herunder analyse af flow og tryktab. På baggrund af en reduceret designlast og bedre indregulering foreslås optimeringer i både bygningen og varmecentralen, og de mulige årlige energibesparelser estimeres ved brug af danske referencevejrudata (DRY) i overensstemmelse med BR18. Resultaterne bruges til at underbygge implementering hos bygherre og til at diskutere incitamenter og læringspunkter for lignende energirenoveringsprojekter. Da denne tekst kun dækker indledende dele af rapporten, præsenteres ingen konkrete tal for besparelser i uddraget.
This bachelor project examines issues that arise when an older production building is repurposed and its heating system is adapted to new indoor climate and energy demands. The case is a former telephone factory converted into multiple tenancies. The core question is how retrofitted components in the heating plant—plate heat exchanger, circulation pumps, and control valves—can be analyzed and optimized so that sizing, operation, and energy use match the new use. The approach combines calculations of the building’s design heat loss according to the Danish standard DS418 with a review of the building envelope and ventilation to identify weak points. Component capacity and operation are assessed through theoretical calculations and on-site hydraulic measurements, including flow and pressure analyses. Based on a reduced design load and improved balancing, the study proposes optimizations to both the building and the heating plant and estimates potential annual energy savings using Danish Design Reference Year weather data (DRY) in line with BR18. The findings support implementation decisions for the project owner and offer lessons and incentives for similar energy renovation projects. As this excerpt covers only the initial sections, no specific numerical savings are presented here.
[Dette resumé er genereret med hjælp fra AI direkte fra projektet (PDF)]
Emneord