A total station as the link between BIM and construction site: Production with precision
Student thesis: Master thesis (including HD thesis)
- Benjamin Flataker
4. term, Management in the Building Industry, Master (Master Programme)
Language | Norwegian |
---|---|
Publication date | 7 Jun 2019 |
Number of pages | 141 |
External collaborator | Kruse Smith No Name vbn@aub.aau.dk Other |