Project Manager's work in Turnkey Contracts
Student thesis: Master Thesis and HD Thesis
- Lidia-Costina Deaconu
- Luiza Patrycja Kostecka
4. term, Management in the Building Industry (cand.tech.), Master (Master Programme)
This report evolves around the Project Manager’s work through the performance of Turnkey Contracts. The research paper has been realised by a group of two students as the Master Dissertation in M. Sc. in Management in the Building Industry, at Aalborg University.
The purpose of this study was to analyse and describe the differences between the Main and Turnkey Contract, management wise and to present the most important assets a good Project Manager should have in order to accomplish a project’s success and effectiveness.
The purpose of this study was to analyse and describe the differences between the Main and Turnkey Contract, management wise and to present the most important assets a good Project Manager should have in order to accomplish a project’s success and effectiveness.
Language | English |
---|---|
Publication date | 6 Jan 2016 |
Number of pages | 109 |
Keywords | Project Manager,, Turnkey Contract, Main Contract |
---|