Pre-Planning in Construction: Differences in ‘Design-Bid-Build’ and ‘Design-Build’ approaches
Student thesis: Master thesis (including HD thesis)
- Simonas Minikevicius
4. term, Management in the Building Industry (cand.tech.), Master (Master Programme)
The following report is about pre-planning in construction. The purpose of the report is to identify the differences in pre-planning using ‘Design-Bid-Build’ and ‘Design-Build’ approaches. Information for the report was gathered using scientific articles, books, personal experience and qualitative interviews.
The report has a theoretical part based on the literature analysis about pre-planning. It describes who is involved in pre-planning and how is it done. The main research question derived from the literature studies about pre-planning.
Stakeholder analysis was made in order to identify the parties that have most influence and power during pre-planning.
Main analysis is based on the results gathered from the qualitative interviews. The respondents for include the owners, contractors, advisors and designer. The main analysis part includes the summaries of the data collected from these interviews and the analysis of the answers.
The results of the research are presented in conclusion chapter.
The report has a theoretical part based on the literature analysis about pre-planning. It describes who is involved in pre-planning and how is it done. The main research question derived from the literature studies about pre-planning.
Stakeholder analysis was made in order to identify the parties that have most influence and power during pre-planning.
Main analysis is based on the results gathered from the qualitative interviews. The respondents for include the owners, contractors, advisors and designer. The main analysis part includes the summaries of the data collected from these interviews and the analysis of the answers.
The results of the research are presented in conclusion chapter.
Language | English |
---|---|
Publication date | 9 Jan 2017 |
Number of pages | 54 |
External collaborator | Danish Defence Estates & Infrastructure Organisation Henrik Sørensen hensor@mil.dk Information group Vilnius Gediminas Technical University Svajunas Karvelis svajunas.karvelis@vgtu.lt Information group Neoprojektai Saulius Misiukas Neoprojektai@gmail.com Information group Gabusta Gintautas Gaivenis gabusta.utena@gmail.com Information group Ramboll Foundation Hans Didrik Nielsen HDN@ramboll.dk Information group InnoBIM Vaidotas Sarka info@innobim.lt Information group A. Zilinskio ir Ko Andrius Onusaitis info@zilinskis.com Information group |
Keywords | pre-planning, design-bid-build, design-build |
---|