Last Planner System in theory and practice
Student thesis: Master thesis (including HD thesis)
- Cathrine Engstrøm
4. term, Management in the Building Industry (cand.tech.), Master (Master Programme)
Language | Danish |
---|---|
Publication date | 2 Jun 2011 |
Number of pages | 73 |