Management in the Building Industry (cand.scient.techn)

Master Programme

Education structure: Education

1. term

Department of Civil Engineering › Study Board of Civil Engineering › Management in the Building Industry (cand.scient.techn)

2. term

Department of Civil Engineering › Study Board of Civil Engineering › Management in the Building Industry (cand.scient.techn)

3. term

Department of Civil Engineering › Study Board of Civil Engineering › Management in the Building Industry (cand.scient.techn)

4. term

Department of Civil Engineering › Study Board of Civil Engineering › Management in the Building Industry (cand.scient.techn)

  1. 2019
  2. BIM as a tool to implement circular economy into construction projects life-cycle

    Jakub Groh, Pavol Dubik

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2019

    Student thesis: Master thesis (including HD thesis)

  3. CEO recruitment in Danish SME-construction companies: A study of the Danish construction-SMEs’ leader competency requirements

    Andreas Brorson Christensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2019

    Student thesis: Master thesis (including HD thesis)

  4. 2018
  5. Conflict management in the construction industry

    Chris Corydon, Jakob Højstrup Laursen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2018

    Student thesis: Master thesis (including HD thesis)

  6. No to public tenders? An examination of the reason why tenders choose not to participate in publicly-commissioned construction projects

    Christoffer Nielsen, Christian Christiansen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2018

    Student thesis: Master thesis (including HD thesis)

  7. The foreigen contractor - the road into Denmark

    Lars Lindegaard

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2018

    Student thesis: Master thesis (including HD thesis)

  8. 2017
  9. Big Data in the Engineering and Construction industry - A study of new digital opportunities for the contractor

    Emil Garman Lorvik, Jesper Guldbæk Nielsen, Simen Olstad

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2017

    Student thesis: Master thesis (including HD thesis)

  10. BIM for building design and Building Commissioning

    Antoaneta Nencheva Kaneva

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2017

    Student thesis: Master thesis (including HD thesis)

  11. Green BIM: Adaptation of Green Building Design Concept with BIM into a New Construction Market - GHANA

    Edwin Afreh Ampratwum

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2017

    Student thesis: Master thesis (including HD thesis)

  12. Pre-Planning in Construction: Differences in ‘Design-Bid-Build’ and ‘Design-Build’ approaches

    Simonas Minikevicius

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2017

    Student thesis: Master thesis (including HD thesis)

  13. Self-leadership in the Construction Industry - Awareness Areas for Implementation

    Lars Degenkolv, Kenneth Weiss

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2017

    Student thesis: Master thesis (including HD thesis)

  14. 2016
  15. Automation of Information Flow from Revit to BSim Using Dynamo

    Pavel Georgiev Pavlov

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  16. Construction Management: TRANSPARENCY IN MONITORING&EVALUATION OF CONSTRUCTION PROJECTS

    Iris Enghis

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  17. Construction Management - Competence Development of Future Leaders in the Construction Industri

    Kasper Libak Pedersen, Kristian Myrrhøj Nielsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  18. Det strategiske udbud

    Jens Falk Møller, Jan Kam Lauritzen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  19. Kan Lean reducere spild i byggebranchen?

    Martin Thingstrup Odgaard, Martin Tage Povlsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  20. Project Manager's work in Turnkey Contracts

    Lidia-Costina Deaconu, Luiza Patrycja Kostecka

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  21. Successful application of Last Planner System combined with Location Based Management System. Divergences between theory and practice.

    Ivan Marinov Dimitrov, Florin Daniel Firte, David González González

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  22. The way to balanced growth: A study of medium-sized Danish construction companies

    Christian Helle Møller, Lars Hjort Madsen, Thomas Schiøler Hansen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2016

    Student thesis: Master thesis (including HD thesis)

  23. 2015
  24. Bestyrelsen: Samspil, udfordringer og værdiskabelse

    Kasper Kongsted Jensen, Martin Griepentrog

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2015

    Student thesis: Master thesis (including HD thesis)

  25. 2014
  26. A study af the proces-values in the construction industry : - based on cost, schedule and quality

    Peter Vildsted Nielsen, Kent Vestergaard Vinther Christensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2014

    Student thesis: Master thesis (including HD thesis)

  27. Er vi truet på livet?

    Frederik Sejbjerg Schøn

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2014

    Student thesis: Master thesis (including HD thesis)

  28. Fælles incitamenter i bygge- og anlægsbranchen

    Lone Høyer Sørensen, Johan Aslak Laursen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2014

    Student thesis: Master thesis (including HD thesis)

  29. Risk Management: Har vi råd til at lade være

    Morten Munkholt, Jannik Kaad Iversen, Vedad Durakovic

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2014

    Student thesis: Master thesis (including HD thesis)

  30. Teamroller gør en forskel

    Esben Gustav Grund Møller, Martin Wolsgaard Iversen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2014

    Student thesis: Master thesis (including HD thesis)

  31. 2013
  32. Risikostyring i byggebranchen: Erfaringsbaseret risikostyring

    Partheepan Selvarajah, Jacob Strøm Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2013

    Student thesis: Master thesis (including HD thesis)

  33. What can the construction industry learn from the manufacturing industry?

    Martin Møller Madsen, Damir Kandic

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2013

    Student thesis: Master thesis (including HD thesis)

  34. 2012
  35. AB 2012? General Conditions for the provision of works and supplies within building and engineering AB 92

    Lars Juhl Vedel, Kresten Theill Devantier Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2012

    Student thesis: Master thesis (including HD thesis)

  36. Is Green the New Black: Assessing the potential benefits and financial viability of green office buildings in Denmark

    Mia Rud Bohnsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2012

    Student thesis: Master thesis (including HD thesis)

  37. Knowledge Management in the Construction Industry: Nonakas Teori om Organisatorisk Videnskabelse i et Praktisk Perspektiv

    Lee Porsgaard

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2012

    Student thesis: Master thesis (including HD thesis)

  38. The search for excellence in Construction industry: A Study on the Factors of Regional Competitiveness in the Danish Construction industry

    Kristian Ditlev Bohnstedt, Jesper Kranker Larsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2012

    Student thesis: Master thesis (including HD thesis)

  39. Trust within the building industry: How to build trust during education?

    Rikke Ørnfeldt Nicolaisen, Jacob Ahlén Lavrsen, Bergar Juul

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2012

    Student thesis: Master thesis (including HD thesis)

  40. 2011
  41. BUILDaTEAM.now: How to improve cooperation in the construction industry

    Nick Nielsen, Kasper Lyngsø

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  42. Construction Management at TGU Powerplant Trinidad

    Jens Peter Nielsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  43. Development: Real Estate Develoment in a Recession Market

    Jens Højgaard Pedersen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  44. Effective and interest-based communication in the project organizations of the construction industry

    Marianne Beedholm Rasmussen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  45. Et skift i samarbejdsparadigmet : Effektivisering af det interorganisatoriske samarbejde på strategisk niveau

    Thomas Hoff

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  46. Knowledge Management

    Mette Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  47. Last Planner System in theory and practice

    Cathrine Engstrøm

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  48. New-Industrialization of the building process: Next step for increased efficiency

    Martin Pedersen, Mads Sølvsten Dahl

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  49. Planning of building logistics: ‐ Focus on logistics in the designphase

    Steffen Hindberg, Steffen Kaas

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  50. Reducing the degree of failure in the construction industry

    Simon Jessen, Kathrine Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  51. Reducing the degree og failures in the construction industry

    Simon Jessen, Kathrine Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2011

    Student thesis: Master thesis (including HD thesis)

  52. 2010
  53. Trust as a competitive parameter

    Henrik Jensen, Birgitte K. Festersen, Joe J. Jensen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2010

    Student thesis: Master thesis (including HD thesis)

  54. 2006
  55. Innovation i byggebranchen: Undersøgelse af nordjyske entreprenører

    Dennis Fischer Larsen

    Management in the Building Industry (cand.scient.techn), (Master Programme) 4. term, 2006

    Student thesis: Master thesis (including HD thesis)