Pre-Planning in Construction: Differences in ‘Design-Bid-Build’ and ‘Design-Build’ approaches
Studenteropgave: Speciale (inkl. HD afgangsprojekt)
- Simonas Minikevicius
4. semester, Byggeledelse (cand.tech.), Kandidat (Kandidatuddannelse)
The following report is about pre-planning in construction. The purpose of the report is to identify the differences in pre-planning using ‘Design-Bid-Build’ and ‘Design-Build’ approaches. Information for the report was gathered using scientific articles, books, personal experience and qualitative interviews.
The report has a theoretical part based on the literature analysis about pre-planning. It describes who is involved in pre-planning and how is it done. The main research question derived from the literature studies about pre-planning.
Stakeholder analysis was made in order to identify the parties that have most influence and power during pre-planning.
Main analysis is based on the results gathered from the qualitative interviews. The respondents for include the owners, contractors, advisors and designer. The main analysis part includes the summaries of the data collected from these interviews and the analysis of the answers.
The results of the research are presented in conclusion chapter.
The report has a theoretical part based on the literature analysis about pre-planning. It describes who is involved in pre-planning and how is it done. The main research question derived from the literature studies about pre-planning.
Stakeholder analysis was made in order to identify the parties that have most influence and power during pre-planning.
Main analysis is based on the results gathered from the qualitative interviews. The respondents for include the owners, contractors, advisors and designer. The main analysis part includes the summaries of the data collected from these interviews and the analysis of the answers.
The results of the research are presented in conclusion chapter.
Sprog | Engelsk |
---|---|
Udgivelsesdato | 9 jan. 2017 |
Antal sider | 54 |
Ekstern samarbejdspartner | Danish Defence Estates & Infrastructure Organisation Henrik Sørensen hensor@mil.dk Informantgruppe Vilnius Gediminas Technical University Svajunas Karvelis svajunas.karvelis@vgtu.lt Informantgruppe Neoprojektai Saulius Misiukas Neoprojektai@gmail.com Informantgruppe Gabusta Gintautas Gaivenis gabusta.utena@gmail.com Informantgruppe Ramboll Foundation Hans Didrik Nielsen HDN@ramboll.dk Informantgruppe InnoBIM Vaidotas Sarka info@innobim.lt Informantgruppe A. Zilinskio ir Ko Andrius Onusaitis info@zilinskis.com Informantgruppe |