Abstract
Holstebro Vandkraftværk og den tilhørende opstemmede vandkraftsø, udgør en delvis spærring for faunaens bevægelse i Storå-systemet. Da Holstebro Kommune ønsker at bibeholde Vandkraftsøens eksistens til rekreative formål er foreslået et omløbsstryg som løsning. Det er således på baggrund af dette, at rådgivervirksomheden Alectia har udarbejdet nogle mulige løsningsforslag, Hvor sedimentet i den nuværende situation hovedsageligt bliver aflejret i vandkraftssøen, vil etableringen af omløbsstryget flytte denne aflejringsproces nedstrøms. Dette kan muligvis føre til at behovet for opgravning af sediment på strækningen i Holstebro, vil forekomme oftere. Endvidere er der en risiko for, at vigtige gydepladser for laksene tilsander nedstrøms vandkraftværket. Sedimenttransporten. Dette projekt tager fokus på denne problemstilling, og derfor er sedimenttransporten i Storåen forsøgt simuleret. I forbindelse med denne transport er udarbejdet et løsningsforslag i form af et sandfang. For at undersøge virkningen af sandfanget indgår dette i en todimensionel dynamisk flowmodel opbygget i MIKE 21, hvor sedimenttransporten er tilkoblet.
Holstebro Vandkraftværk and the associated reservoir, Vandkraftsøen, represents a partial obstruction for the fauna movement in the Storå-system. As Holstebro Kommune wishes to maintain the existence of the reservoir for recreational purposes a bypass flow has been proposed as a solution. Based on this the consultancy firm Alectia has composed some possible solutions. Where the sediment in the current state mainly is deposited in the reservoir, an establishment of a bypass flow will move this deposition process downstream This could possibly lead to the need of dredging the stretch of the Storå placed in Holstebro, occurs more often. Furthermore, as a consequence of modified sediment transport, there is a risk that important spawning grounds for the salmon placed downstream the hydropower plant gets buried. This project is focusing on the issue described above, and therefore the sediment transport in Storåen has been imulated. In connection with the sediment transport a solution is made in the form of a sand trap. To examine the effect of this, the sand trap is included in a two-dimensional dynamic flow model built in MIKE 21, where sediment transport is connected.
Kolofon: Denne side er en del af AAU Studenterprojekter — Aalborg Universitets studenterprojektportal. Her kan du finde og downloade offentligt tilgængelige kandidatspecialer og masterprojekter fra hele universitetet fra 2008 og frem. Studenterprojekter fra før 2008 kan findes i trykt form på Aalborg Universitetsbibliotek.
Har du spørgsmål til AAU Studenterprojekter eller Aalborg Universitets forskningsregistrering, formidling og analyse, er du altid velkommen til at kontakte VBN-teamet. Du kan også læse mere i AAU Studenterprojekter FAQ.